![]() The contractor will notify affected residents by doorhanger 48 hours before the work begins. All vehicles must be removed from the street no later than 8 a.m. Crack sealing is done annually, usually from July through September, and a schedule is published here once it is established.Ĭrack and slurry seal will be applied to the following Corvallis streets between the hours of 8 a.m. Alternatively, you can run the portable Viewer without installation. ![]() ![]() Residents on affected streets will receive a mailing with a detailed schedule of streets to be crack-sealed prior to the beginning of work. Install the Viewer on the computer you want to control from. Streets are not closed during crack-seal work, but on-street parking is prohibited so the contractor has full access to the work area from curb to curb. Using crack seal in conjunction with slurry seal provides the most cost-effective method of preventing premature pavement failures and aging. The sealant will prevent the invasion of surface water between the layers of asphalt and sub-grade rock, thus preventing premature failures, deterioration and potholes. The sealant contains a minimum of 18% recycled tire rubber and forms a long lasting, resilient seal in cracks and joints which is flexible and expandable in varying and extreme pavement temperatures. ![]() During the Annual Crack Seal Program, a hot-pour, petroleum-based pavement crack and joint sealant is used to fill cracks in City streets.
0 Comments
Leave a Reply. |
Details
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |